> For the complete documentation index, see [llms.txt](https://guides.tability.io/docs/llms.txt). Markdown versions of documentation pages are available by appending `.md` to page URLs; this page is available as [Markdown](https://guides.tability.io/docs/become-a-tability-power-user/how-tos/how-to-roll-up-progress-from-dependent-key-results.md). Agents can also search and read this documentation through its [MCP server](https://guides.tability.io/docs/~gitbook/mcp).

# How to roll up progress from dependent key results

Calculate a parent key result from the progress of its dependent key results

Use **Rollup dependencies** when a higher-level key result should be calculated from the key results that contribute to it. For example, a company revenue target can roll up values from Sales and Customer Success targets.

The workflow has two parts:

1. Connect the contributing key results as dependencies.
2. Change the parent key result to the **Rollup dependencies** type, then choose how to calculate its value and evaluate its target.

{% hint style="info" %}
Adding relationships does not update the parent value by itself. The parent must also use the **Rollup dependencies** key result type.
{% endhint %}

## Connect the dependent key results

1. Open the parent key result to show its details panel.
2. Expand **Relationships** and select **Add relationship**.
3. Under **Add dependency**, select **Add dependent key result**.
4. Select the plan containing the contributing key result.
5. Select the key result, then select **Save**.
6. Repeat for every key result that should contribute to the roll-up.

The connected items now appear under **Dependencies** on the parent key result. See [Outcome relationships](https://guides.tability.io/docs/become-a-tability-power-user/features/outcomes-key-results/outcome-relationships.md) for parent, dependency, related, and removal workflows.

## Configure the roll-up

1. Open the parent key result.
2. Select the `...` menu and **Edit**.
3. On the **Target** tab, choose **Rollup dependencies**.
4. Choose a **Target rule**: **Improvement**, **Stay above**, or **Stay below**.
5. Review the connected items under **Dependent key results**.
6. Choose a **Rollup type**:
   * **Rollup values** uses the current numeric values from the dependencies. Use values measured in the same unit, such as revenue in dollars.
   * **Rollup percentages** uses their current completion percentages.
7. Choose the **Method**:
   * **Sum** adds current values and is available for **Rollup values**.
   * **Average** averages the values or percentages.
   * **Latest** uses the value or completion percentage from the dependency with the most recent check-in date.
8. Set the target and starting value or optional baseline for your target rule, as described below.
9. Review the **Preview value**, then select **Save**.

If no items appear under **Dependent key results**, return to the details panel and add them with **Add dependency**.

## Choose a target rule

The rollup type and method determine the parent's current value. The target rule determines how Tability evaluates that value.

| Target rule     | When to use it                                                                | Settings                                                                                                |
| --------------- | ----------------------------------------------------------------------------- | ------------------------------------------------------------------------------------------------------- |
| **Improvement** | Move a metric from a starting value toward a target over the plan's duration. | For value rollups, set the starting value and target. Percentage rollups use a 0% to 100% target range. |
| **Stay above**  | Keep the rolled-up value at or above a minimum.                               | Set the threshold. Optionally add a baseline below the threshold to calculate progress.                 |
| **Stay below**  | Keep the rolled-up value at or below a maximum.                               | Set the threshold. Optionally add a baseline above the threshold to calculate progress.                 |

All three rules work with both value and percentage rollups. For example, a percentage rollup can use **Stay above** with a target of 85%; threshold targets are not restricted to 100%.

Existing rollups without an explicit target rule continue to use **Improvement**.

### How confidence is calculated

Tability evaluates the rolled-up value against the **parent's own target rule**. It does not copy or average the dependencies' confidence ratings.

* **Improvement** compares progress toward the parent target with the progress expected at that point in the plan.
* **Stay above** is green when the rolled-up value is equal to or above the threshold, and red when it is below.
* **Stay below** is green when the rolled-up value is equal to or below the threshold, and red when it is above.

This means a parent can be red even when all its dependencies are green, or green when a dependency is red. Their targets may differ.

### Optional baselines for threshold rules

For **Stay above** and **Stay below**, a baseline lets Tability calculate a completion percentage from the distance between the baseline and the threshold. It does not change whether the value meets the threshold.

* For **Stay above**, the baseline must be lower than the threshold.
* For **Stay below**, the baseline must be higher than the threshold.

For example, with **Stay below 50** and a baseline of **100**, a rolled-up value of **75** shows **50% progress**. Confidence is still red because 75 exceeds the threshold of 50.

Leave the baseline blank when a completion percentage is not useful. Tability still evaluates confidence, but the key result has no completion percentage and is excluded from objective and plan completion calculations.

## Examples

### Roll up revenue toward a company target

Choose **Rollup values**, **Sum**, and **Improvement**. Set a starting value of **$0** and a target of **$160,000**.

If three dependencies report **$10,000**, **$5,000**, and **$10,000**, the parent value is **$25,000**, or about **15.6% progress**. Its confidence depends on progress toward the $160,000 target at that point in the plan, regardless of the dependencies' confidence ratings.

### Keep average completion above a threshold

Choose **Rollup percentages**, **Average**, and **Stay above**. Set the threshold to **85%**.

If two dependencies are **80%** and **84%** complete, the rolled-up value is **82%** and confidence is red. At **85%** or higher, confidence is green.

With an optional baseline of **0%**, an 82% rolled-up value represents about **96.5% progress toward the 85% threshold**. The rolled-up value and the parent's completion percentage measure different things. Without a baseline, confidence still works, but the parent has no completion percentage.

## Enable automatic updates

On Premium workspaces, enable **Enable auto-sync** to sync progress from the dependencies without a manual value update.

1. Turn on **Sync progress with the data source**.
2. Set **Sync interval** to **Daily** or **Weekly**.
3. If available, enable **Tability AI** when you also want AI analysis included with the synced progress.
4. Select **Save**.

Without auto-sync, the roll-up value is still calculated from the connected dependencies when the key result is updated.

## Check the relationship chain

Open the [Dependencies Map](https://guides.tability.io/docs/become-a-tability-power-user/features/dependencies-map.md) from the parent key result. Use **Dependencies** to trace contributors downstream or **Both** to include the parent's upstream context.

## Troubleshooting

### A team key result is missing from the roll-up

Confirm that it appears under **Dependencies** on the parent. A **Related** connection does not contribute to a roll-up.

### Sum is not available

Choose **Rollup values**. Percentage roll-ups support **Average** and **Latest**, not **Sum**.

### Auto-sync is disabled

Auto-sync requires Premium. You can still save the roll-up configuration and update it without the scheduled sync.

### The parent confidence differs from its dependencies

Check the parent's **Target rule** and target. Rollup confidence is calculated from the rolled-up value against the parent's target, independently of the dependencies' confidence ratings.

### A threshold rollup has no completion percentage

Add an optional **Baseline** if you want a completion percentage. Use a baseline below the threshold for **Stay above**, or above it for **Stay below**. Leaving it blank still allows Tability to calculate confidence.